1. Welcome to CAST's newly designed and improved Forum

    Log in or Sign up and share the knowledge!

    Dismiss Notice

MR2 roof assembly

Discussion in 'wysiwyg' started by haakon_brg, Dec 31, 2016.

  1. haakon_brg

    haakon_brg New Member

    Joined:
    Dec 31, 2016
    Messages:
    1
    Likes Received:
    0
    Hi, Im testing out wysiwyg to see if i want to replace another visualizer, and I have stumbled upon a problem with getting the MT1 sleeve block to be placed correctly on the MT1 truss tower.
    I´ve tried to read the manual to find a solution but no luck so far. Anyone who has a tip for me?
     
  2. roygbiv

    roygbiv Active Member

    Joined:
    Feb 6, 2014
    Messages:
    153
    Likes Received:
    14
    Hey
    I have had the same experience when trying to assemble our MR1 roof.
    I started with the Base
    added Hinge and the 30x30 sections
    added Tower Head in the top

    Then I added the Sleeve block and it may not behave as expected, but it's just following the same rules as all other truss in WYSIWYG. I added it to one of the sections and Ungrouped the sleeve block. This ungroups the whole structure, so choose all the items in the tower (base, hinge, sections, tower head) and Reassemble Truss CTRL+SHIFT+G.

    Then when you will move you Sleeve Block up and down, make sure the Z-axis is locked, so you only move the Sleeve Block straight up or down.
    (see attached)

    Does this help?
     

    Attached Files:

Share This Page